Revised PRC 421 Recommissioning Project (Venoco, Inc.)
Final EIR – November 2014
- Notice of Availability and Intent to Certify an EIR
Note to Reader: The full Final EIR may be downloaded as one file here and the appendices may also be downloaded as one file here. - Cover
- Table of Contents
- Part I – Preface
- Part II – Response to Comments
- Part III – Revisions to Recirculated Draft EIR
- Executive Summary
- 1.0 – Introduction
- 2.0 – Project Description
- 3.0 – Cumulative Impacts Methodology
- 4.0 – Environmental Impact Analysis
- 5.0 – Project Alternatives Analysis
- 6.0 – Other Required CEQA Sections and Environmentally Superior Alternative
- 7.0 – Mitigation Monitoring Program
- 8.0 – Report Preparation Sources and References
Appendices
- Appendix A – EIR Distribution List
- Appendix B – Comments on NOP
- Appendix C – Safety
- Appendix D – Technical Air Quality
- Appendix E – Dispersants White Paper
- Appendix F – Best Management Practices
- Appendix G – Venoco Project Description
- Appendix H – Mitigation Measures from Line 96 Modification Project EIR
- Appendix I – Impacts and Mitigation from Line 96 Modification Project Final EIR
- Appendix J – Environmental Releases During Line 96 Construction
- Appendix K – Ellwood Onshore Facility Permit History and Safety Audits
- Appendix L – History of Wetland Mitigation Performed for Impacts Caused by the PRC 421 Access Road
Abbreviations Used
APTR = Analysis of Impacts to Public Trust Resources and Values
CEQA = California Environmental Quality Act
EA = Environmental Assessment
EIR = Environmental Impact Report
EIS = Environmental Impact Statement
FONSI = Finding of No Significant Impact
IS = Initial Study
MND = Mitigated Negative Declaration
ND = Negative Declaration
NEPA = National Environmental Policy Act
NOI = Notice of Intent
NOP = Notice of Preparation
CEQA Documents
Contact
Electronic copies of CEQA documents prior to 2001 may be requested from:
Eric Gillies | 916.574.1897
Eric.Gillies@slc.ca.gov