Final EIR – November 2014
- Notice of Availability and Intent to Certify an EIR
Note to Reader: The full Final EIR may be downloaded as one file here and the appendices may also be downloaded as one file here. - Cover
- Table of Contents
- Part I – Preface
- Part II – Response to Comments
- Part III – Revisions to Recirculated Draft EIR
- Executive Summary
- 1.0 – Introduction
- 2.0 – Project Description
- 3.0 – Cumulative Impacts Methodology
- 4.0 – Environmental Impact Analysis
- 5.0 – Project Alternatives Analysis
- 6.0 – Other Required CEQA Sections and Environmentally Superior Alternative
- 7.0 – Mitigation Monitoring Program
- 8.0 – Report Preparation Sources and References
Appendices
- Appendix A – EIR Distribution List
- Appendix B – Comments on NOP
- Appendix C – Safety
- Appendix D – Technical Air Quality
- Appendix E – Dispersants White Paper
- Appendix F – Best Management Practices
- Appendix G – Venoco Project Description
- Appendix H – Mitigation Measures from Line 96 Modification Project EIR
- Appendix I – Impacts and Mitigation from Line 96 Modification Project Final EIR
- Appendix J – Environmental Releases During Line 96 Construction
- Appendix K – Ellwood Onshore Facility Permit History and Safety Audits
- Appendix L – History of Wetland Mitigation Performed for Impacts Caused by the PRC 421 Access Road