Two public review and virtual public hearings were held on November 17, 2021. A copy of the presentation will be posted here shortly. Public comment period ended December 22, 2021. For additional information, please contact Sarah Mongano at sarah.mongano@slc.ca.gov or by phone at 916.574.1889.
Notice of Availability of Draft EIR – October 2021
- Notice of Availability | Aviso de Disponiblidad
- Executive Summary | Resumen Ejecutivo
- Draft EIR (available in four parts)
Appendicies
- Appendix A – Abridged List of Major Federal and State Laws, Regulations, and Policies Potentially Applicable to the Project
- Appendix B – Distribution List
- Appendix C – Public Scoping Documents (available in three parts)
- Appendix D – Water Supply Assessment
- Appendix E – Calcite Substation Detailed Project Description
- Appendix F – Biological Resources Technical Report
- Appendix G – Phase I Cultural Resource Assessment
- Appendix H – Air Quality and Greenhouse Gas Data
- Appendix I – Noise Calculations