Mitigated Negative Declaration (MND) – December 2015
- Notice of Intent
- Note to Reader: The full MND may be downloaded as one file here.The full MND file does not contain Appendices. Appendices are available for download below.
- Cover
- Table of Contents and Acronyms
- Executive Summary
- 1.0 – Project and Agency Information
- 2.0 – Project Description
- 3.0 – Environmental Checklist and Analysis
- 3.1 – Aesthetics
- 3.2 – Agriculture and Forest Resources
- 3.3 – Air Quality
- 3.4 – Biological Resources
- 3.5 – Cultural and Paleontological
- 3.6 – Geology and Soils
- 3.7 – Greenhouse Gas Emissions
- 3.8 – Hazards and Hazardous Materials
- 3.9 – Hydrology and Water Quality
- 3.10 – Land Use and Planning
- 3.11 – Mineral Resources
- 3.12 – Noise
- 3.13 – Population and Housing
- 3.14 – Public Services
- 3.15 – Recreation
- 3.16 – Transportation / Traffic
- 3.17 – Utilities and Service Systems
- 3.18 – Mandatory Findings of Significance
- 4.0 – Other Major Areas of Concern
- 5.0 – Mitigation Monitoring Program
- 6.0 – MND Preparation Sources and References
Appendices
- Appendix A – Project Description Support Exhibits
- Appendix B – Nalco EC6106A Material Safety Data Sheet
- Appendix C – Drawing AA 62302-B Underpass at Coordinate 7+00 and State Highway
- Appendix D – Asbestos and Lead Paint Survey Report, Royal Environmental Services, Inc.
- Appendix E – Marine Safety and Anchoring Plan
- Appendix F – Marine Wildlife Contingency Plan
- Appendix G – Oil Spill Response Plan
- Appendix H – Air Quality and Greenhouse Gases Spreadsheets
- Appendix I – Marine Biological Resources Survey, Merkel & Associates, Inc.
- Appendix J – Underwater Noise Impacts Report, Greeneridge Sciences, Inc.
- Appendix K – Cultural Resources Support Material
- Appendix L – Shoreline Evolution Analysis Technical Memo, S. Jenkins, PhD
- Appendix M – Noise Support Information
- Appendix N – Comments on the Draft Mitigated Negative Declaration