Notice of Determination – November 2009
Revised Final Environmental Impact Report – October 30, 2009
- Notice of Availability and Notice of Intent to Certify an EIR
- Cover
- Title Page
- Table of Contents
- 1.0 – Introduction
- 2.0 – Summary Public Review
- 3.0 – Responses to Comments
- 4.0 – Revisions to the Draft EIR
Appendices
- A to I – Revised FEIR PG&E Line 406-407
- Appendix D – Air Quality
- Appendix H3 – System Safety – Risk of Upset
- Appendix J – Public Hearing Transcripts
Draft Environmental Impact Report – April 29, 2009
- Public Comments
- Notice of Availability
- Cover
- Title Page
- Table of Contents
- Executive Summary
- 1.0 – Introduction
- 2.0 – Project Description
- 3.0 – Alternatives and Cumulative Projects
- 4.0 – Environmental Analysis
- 4.1 – Aesthetic / Visual Resources
- 4.2 – Agricultural Resources
- 4.3 – Air Quality
- 4.4 – Biological Resources
- 4.5 – Cultural Resources
- 4.6 – Geology and Soils
- 4.7 – Hazards and Hazardous Materials
- 4.8 – Hydrology and Water Quality
- 4.9 – Land Use and Planning
- 4.10 – Noise
- 4.11 – Recreation
- 4.12 – Population and Housing / Public Services/Utilities and Service Systems
- 4.13 – Transportation and Traffic
- 4.14 – Energy and Mineral Resources
- 5.0 – Environmental Justice
- 6.0 – Other Required CEQA Sections
- 7.0 – Mitigation Monitoring Program
- 8.0 – Report Preparation Personnel
- 9.0 – References
- 10.0 – Acronyms
Appendices
- Appendix Title Page
- Appendix Table of Contents
- Appendix A – Mailing and Distribution List
- Appendix B – Notice of Preparation (NOP), Comment Letters, Meeting Transcripts, and Location of Responses
- Appendix C – Additional Alternative Route Analysis Documentation
- Appendix D – Air Quality Data
- Appendix E – Biological Resources
- Appendix E1 – Line 406/407 Jurisdictional Delineation Reports
- Appendix E2 – Line 406 Rare Plant Survey
- Appendix E3 – Line 407 East Plant Report
- Appendix E4 – Line 407 East Additional Rare Plant Survey
- Appendix E5 – Line 407 West Plant Report
- Appendix E6 – Line 406/407 Amphibian and Reptile Habitat Assessment
- Appendix E7 – Line 406/407 Avian and Mammalian Habitat Assessment
- Appendix E8 – Line 406/407 Fish Habitat Assessment
- Appendix E9 – Line 407 East Dry-Season Sampling for Branchiopod
- Appendix E10 – Line 407 East Wet-Season Sampling for Branchipod
- Appendix E11 – Line 407 West Valley Elderberry Longhorn Beetle Survey
- Appendix E12 – Line 406/407 Biological Assessment
- Appendix E13 – Special-Status Species Assessment Tables
- Appendix E14 – County Goals, Policies, and Objectives Pertaining to Biological Resources
- Appendix F – Cultural, Paleontological, and Historical Resources
- Appendix F1 – Line 406 Archaeological Survey Report
- Appendix F2 – Line 407 Cultural Resources Survey
- Appendix F3 – Realignment Cultural Resources Letter Report
- Appendix F4 – Line 406/407 Paleontological Survey
- Appendix F5 – Historical/Architectural Survey Report
- Appendix F6 – Cultural Resources Survey for the Four Alternative Routes
- Appendix G – Geological Technical Study
- Appendix H – Environmental Site and Risk Assessments
- Appendix I – Noise Analysis
CEQA Documents
Receive Updates
Join this e-list to stay informed about CEQA projects involving the California State Lands Commission.
Abbreviations
APTR = Analysis of Impacts to Public Trust Resources and Values
CEQA = California Environmental Quality Act
EA = Environmental Assessment
EIR = Environmental Impact Report
EIS = Environmental Impact Statement
FONSI = Finding of No Significant Impact
IS = Initial Study
MND = Mitigated Negative Declaration
ND = Negative Declaration
NEPA = National Environmental Policy Act
NOI = Notice of Intent
NOP = Notice of Preparation
Contact
Electronic copies of CEQA documents before 2010 may be requested from:
Nicole Dobroski, Chief
Environmental Science, Planning, and Management Division
916.574.0742
DESPMChief.Public@slc.ca.gov