Welcome to the State of California

Right Column

BHP Billiton Cabrillo Port Liquefied Natural Gas Deepwater Port

Para leer el documento en Español apriete aquí.  

Revised Draft Environmental Impact Report

3/13/06

  Notice of Availability  
  Table of Contents  
  Executive Summary  
    Figure ES-1  
    Figure ES-2  
    Figure ES-3  
  1.0 Introduction  
    Figure 1.0-1  
  2.0 Description of the Proposed Action  
    Figure 2.1-1  
    Figure 2.1-2  
    Figures 2.2-2 and 2.2-3  
    Figure 2.4-1  
    Figure 2.4-2  
    Figure 2.6-1  
    Figure 2.6-2  
    Figure 2.6-3  
    Figure 2.6-4  
    Figure 2.7-1  
  3.0 Alternatives  
    Figure 3.3-1  
    Figure 3.3-3  
    Figure 3.4-1  
    Figure 3.4-2  
    Figure 3.4-3  
  4.0 Environmental Analysis  
    4.1 Introduction to Environmental Analysis  
      Figure 4.1-1  
    4.2 Public Safety: Hazards and Risk Analysis  
    4.3 Marine Traffic  
      Figure 4.3-1  
      Figure 4.3-2  
      Figure 4.3-3  
      Figure 4.3-4  
    4.4 Aesthetics  
    4.5 Agriculture and Soils  
      Figure 4.5-1  
      Figure 4.5-2  
    4.6 Air Quality  
    4.7 Biological Resources - Marine  
    4.8 Biological Resources - Terrestrial  
      Figure 4.8-1a  
      Figure 4.8-1b  
      Figure 4.8-1c  
      Figure 4.8-2  
      Figure 4.8-3a  
      Figure 4.8-3b  
      Figure 4.8-4a  
      Figure 4.8-4b  
      Figure 4.8-4c  
    4.9 Cultural Resources  
    4.10 Energy and Minerals  
    4.11 Geologic Resources and Hazards  
      Figure 4.11-1  
      Figure 4.11-2  
      Figure 4.11-3  
      Figure 4.11-4  
      Figure 4.11-5  
      Figure 4.11-6  
      Figure 4.11-7  
    4.12 Hazardous Materials  
    4.13 Land Use  
      Figure 4.13-1  
      Figure 4.13-2  
      Figure 4.13-3  
      Figure 4.13-4  
      Figure 4.13-5  
    4.14 Noise and Vibration  
    4.15 Recreation  
    4.16 Socioeconomics  
    4.17 Transportation  
    4.18 Water Quality and Sediments  
      Figure 4.18-1  
      Figure 4.18-2  
    4.19 Environmental Justice  
    4.20 Cumulative Impacts Analysis  
  5.0 Other Required NEPA/CEQA Considerations  
  6.0 Conclusions and Recommendations  
  7.0 Report Preparation  
  Appendices  
    A Distribution List  
    B Notice of Preparation  
    C1 Independent Risk Assessment Main Report  
      Appendix A  
      Appendix B  
      Appendix C  
      Appendix D  
      Appendix E  
      Appendix F  
    C2 Sandia Review of Independent Risk Assessment  
    C3 Public Safety  
    D1 Drilling Fluid Release Monitoring Plan for HDB  
    D2 Anchor Mitigation Plan for HDB Nearshore Pipeline Project - Marine Operations  
    D3 HDB Nearshore Pipeline Project - Marine Operations  
    D4 Preliminary Construction Procedure and Design for HDB Pipeline Landfall  
    D5 Balast Water System Operations and Design Features  
    E California Coastal Commission LNG Siting Studies (Excerpts)  
    F Distance Calculations for Aesthetics Analysis  
    G1 Air Quality - Construction Emissions  
    G2 Air Quality - Operating Emissions  
    G3 Air Quality - FSRU Startup Emissions  
    G4 Air Quality - General Conformity Determination  
    G5 Air Quality - Nitrogen Dioxide, Sulfur Dioxide, Carbon Monoxide, and Particulate Matter Emissions  
    G6 Air Quality - Health Risk Analysis of Onshore Pipeline Construction  
    G7 Sierra Research CEQA Air Quality Assessment  
      Text    
      Figures    
    G8 Air Quality - Ammonia Emmissions  
    H1 Ichthyoplankton Impact Analysis  
    H2 U.S. Department of State Bureau of Oceans and international and Scientific Affairs Letter  
    I Section 7 Threatened and Endangered Species Agency Consultation  
    J1 USGS Comments on Potential Geologic and Seismic Hazards Affecting the Ventura County Coast  
    J2 Preliminary Seismic and Geologic Hazards Evaluation  
      Part 1    
      Part 2    
      Part 3    
      Part 4    
      Part 5    
      Part 6    
      Part 7    
      Part 8    
      Part 9    
      Part 10    
      Part 11    
      Part 12    
      Part 13    
      Part 14    
      Part 15    
    J3 Geologic and Geotechnical Evaluation of Proposed Pipeline Routes  
      Figures 1-4  
      Figures 5-8  
      Figures 9-11  
      Figures 12-14  
      Figures 15-17  
      Figures 18-19  
      Figures 20-22  
    J4 Geotechnical Desktop Study  
      Part 1    
      Part 2    
      Part 3    
      Part 4    
      Part 5    
      Part 6    
      Part 7    
    K Summary of Environmental Data Resources, Inc.  

Memorandum of Agreement between the U.S. Coast Guard, Maritime Administration, and California State Lands Commission for the Review of Deepwater Ports License Applications

12/5/03